Home
New  Equipment
Used Equipment
Specials
Our Office
What We Do
Customers
Rate Card
Web Links
Personal
Contact Us

 

The Gilbert Lodge Project

March 18, 2003

(l-r) Paula Persons WØHA, Jim Barry WØIRE, Mark Persons WØMH, and Dave Cox, KBØVYI, unloading 80 feet of used commercial tower.  After it is cleaned up and painted, about 15 feet of the bottom section will be in the ground  and surrounded with concrete.  

April 26, 2003

A diesel powered air compressor was needed for the sand blasting operation.  Skee Mass, WØDCY, is on the right with the tower

April 26, 2003

A close-up of Skee sand blasting one of the tower sections.  Afterward, the sections were painted with a high quality brown primer.  

  Comments?         Back to the building plans 

page last edited 01/29/2006