![]() |
|||||||||||||
|
|
||||||||||||
|
The Gilbert Lodge Project |
|||||||||||||
|
September 24, 2003 The walls are being sanded in preparation for painting. The worker is using a rotary disc sander connected to a vacuum hose to extract as much dust as possible. (Click on the photo or here for a larger view.) |
|
September 26, 2003 The painters arrived to put the primer coat on. Note the paint on his face below where his goggles were worn. This painter listens to KLIZ, 107.5 FM Radio in Brainerd, MN. (Click on the photo or here for a larger view.) |
Comments?
Back to the building plans
page last edited 01/29/2006